Portfolio Archive | Page 4 of 9 | Pittsburgh Remodeling Company
0
archive,paged,post-type-archive,post-type-archive-portfolio_page,paged-4,post-type-paged-4,ajax_fade,page_not_loaded,,select-child-theme-ver-1.0.0,select-theme-ver-1.7.1, vertical_menu_background_opacity,smooth_scroll,wpb-js-composer js-comp-ver-5.4.7,vc_responsive
 

Archive

  • All
  • Resources for Homeowners
  • Brand Values

The Jefferson

We assisted our homeowners with concept, design and all stages of construction....

Avon

We were really fortunate to be a part of this finished basement project from start to finish. We worked with our homeowners to transform an unfinished basement room into the coziest space imaginable. In doing so, we had the chance to work with some really cool materials. For instance; we distressed and finished hardwood hickory for all the trim. The lighting was really cool, too. Everything is LED, and all of the strip lights are color changing and Bluetooth controlled. There's a fireplace, and a bar, and acoustic insulation everywhere.  ...

Trotter

We were very fortunate to collaborate with our friends at Jacob Evans Kitchen & Bath for this kitchen remodel in Peters Township. Our Homeowners love their home and have lived there since the previous kitchen was installed (almost 20 years ago!). They felt like it was time for an update. Our work included demolition, installing new flooring, new electric, new lighting, new walls and ceilings, cabinets, counters and back-splash....

Carriage

This was a big project in a unique mid-century home in Pittsburgh!  The renovation was inspired by our clients' desire to update the look and expand the space while retaining and improving the skylight window.  In the master bathroom, we were able to steal space from an oversize hallway closet to build a new shower and fit a double vanity. Meanwhile, in the kitchen, we removed a wall that partitioned off the space, rearranged the whole room and cut a new feature window into the wall above the sink (that didn't used to be there).  This project included updating electrical, new drywall, tile, a heated tile floor, quartz counters and all new fixtures. We also had the pleasure of working with Jacob Evans Kitchen & Bath on this project; they...

Bathroom remodeling

Plainfield

This project was complicated. Our goal was to completely remodel two bathrooms, while slightly changing the floor plan in each room to allow for more useful closet space in two adjacent rooms. There was a lot of structural and mechanical work in an old home, and the family chose to live in their home through construction. We were very fortunate to collaborate with our friends at Jacob Evans Kitchen & Bath for this project. They provided all materials and did an amazing job with the initial design....

Bathroom remodel

St. James

This was a unique project for a unique home!  The renovation was inspired by the clients' desire to update the look and expand the space while retaining and improving the skylight window.  We were able to steal space from an oversize hallway closet to build a new shower and removed a radiator.  This project included updating all mechanicals, new drywall, tile, a heated tile floor and heated towel bar, and all new fixtures.  The feature here is the stained glass that the clients had fabricated into the original window by a local artisan.  We reinstalled the window with LED lights above to highlight the vibrant colors and patterns....